Eclipse Bazaar · products.json · verdicts.json · llms.txt

Eclipse Awardline

Grant-term spending evidence over fixture awards; local/simulator only. PASS-CONDITIONAL (local/simulator) — award terms sealed once; each spend sealed against a term as it happens, hash-chained per award; reports recompute from those receipts. An Awardline report is a recomputation from sealed receipts, not an audit, not an allowability determination, and not agency acceptance. Counsel gate (C1, SPEC §10 counsel/govcon gate) named and unbuilt: any real-award reliance.

status: in-developmentclass: mcpCompliance & EvidenceGovernment & Civic

Vendor: Cyan Eclipse Technologies

What it does

Tools

awardline_terms_register · awardline_spend_seal · awardline_status · awardline_report · awardline_period_close · awardline_export · awardline_verify

Platforms

Certification

Bench verdict: PASS-CONDITIONAL (local/simulator)

Certified scope: Eclipse Awardline — PASS-CONDITIONAL (local/simulator) — Verity bench of v0.1.0 (2026-10-27, argus101-program-20261027/wave4/bench-awardline.md) + delta re-bench of v0.1.1 (argus101-program-20261027/wave4/rebench-awardline.md: D1–D5 all CLOSED, condition C4 SATISFIED, builder suite 26/26 reproduced). PASS-CONDITIONAL (local/simulator) is not CERTIFIED — certified is false, and nothing beyond that verdict at its exact scope is claimed. Scope is exactly: local stdio, fixture award terms + fixture spend records only, value_class "test"; no real award, real grantee, real funds, real accounting system, or government system is touched. Load-bearing label: an Awardline report is a recomputation from sealed receipts, not an audit, not an allowability determination, and not agency acceptance. Standing conditions: C1 §10 counsel/govcon gate (unbuilt, binds any real-award reliance), C2 external anchor (caps the verdict at PASS-CONDITIONAL), C3 real Herald RS256 (required with re-bench before any live phase), C5 name screen still bind.

Not tested:

  • Any reliance on a real award — real award terms, real grantees, real funds, real drawdowns, agency reporting, or any government system is SPEC §10 counsel/govcon-gated (condition C1) and UNBUILT; v0.1.1 contains no dormant live path
  • Audit, allowability, or agency acceptance — an Awardline report is a recomputation from sealed receipts, not an audit, not an allowability determination, and not agency acceptance; Awardline does not approve spending or decide allowability under an award
  • Term-registration correctness — Awardline seals spend against term versions as registered by the grantee; a mis-registered term produces faithfully sealed evidence against the wrong terms, and detecting that is the grantee's review, not a recomputation result
  • External anchoring / multi-party reliance — the pure local file store caps any verdict at PASS-CONDITIONAL (local/simulator) (condition C2); an external anchor is required before live or multi-party reliance
  • Production signing — v0.1.1 signing is an HMAC fixture stand-in for Herald RS256 (condition C3: real Herald RS256 required with re-bench before any live phase; fixture keys in keys/, gitignored, mode 600)

Live state note: Bench evidence: argus101-program-20261027/wave4/bench-awardline.md (Verity bench of v0.1.0, PASS-CONDITIONAL (local/simulator), defects D1–D5, conditions C1–C5) + argus101-program-20261027/wave4/rebench-awardline.md (Verity delta re-bench of v0.1.1 fix commit 80f49b7: D1–D5 all CLOSED, C4 SATISFIED, builder suite 26/26 reproduced, no new defect). No test-bench scorecard was issued for this verdict and none is claimed (scorecard_ref/card_url null).

Pricing

PRICED — $99/mo, via the Eclipse Bazaar bench-order/intake path only. No checkout, payment, or buy-now link exists for this product, and no Stripe object exists for it in this pass: intake orders are reviewed and confirmed by the operator before any payment link is sent. Metering shape per SPEC §9 (metering points only in v0.1.1, no charge path built): one Meter-grammar point per distinct award per fixture period at the $99/mo shape. No charge path is built, no payment is taken, and no live Meter ingest is claimed. The local package is the reference implementation. Repository is PRIVATE.

Install / verify

No install command is published for this product in the catalog or its registry record.

Official MCP Registry name: io.github.CYAN-ECLIPSE-TECHNOLOGIES-LLC/eclipse-awardline-mcp

Registry listing: https://registry.modelcontextprotocol.io/v0.1/servers/io.github.CYAN-ECLIPSE-TECHNOLOGIES-LLC%2Feclipse-awardline-mcp/versions/0.1.1

Repository: https://github.com/CYAN-ECLIPSE-TECHNOLOGIES-LLC/eclipse-awardline-mcp

Verify any MCP server in your client configs against this catalog with bazaar check (Eclipse Bazaar MCP / CLI — see llms.txt).

Verification

Issued by Verity (Cyan Eclipse Technologies) — a role-separated internal desk of the same company that publishes this catalog. Issuer relationship: first-party. The bench is not an external third-party evaluator.

Availability

Catalog status: in-development

Distribution: MCP over stdio

Live-state note (from the catalog record): Bench evidence: argus101-program-20261027/wave4/bench-awardline.md (Verity bench of v0.1.0, PASS-CONDITIONAL (local/simulator), defects D1–D5, conditions C1–C5) + argus101-program-20261027/wave4/rebench-awardline.md (Verity delta re-bench of v0.1.1 fix commit 80f49b7: D1–D5 all CLOSED, C4 SATISFIED, builder suite 26/26 reproduced, no new defect). No test-bench scorecard was issued for this verdict and none is claimed (scorecard_ref/card_url null).

Test verdict

Bench verdict: PASS-CONDITIONAL (local/simulator)

Certified scope: Eclipse Awardline — PASS-CONDITIONAL (local/simulator) — Verity bench of v0.1.0 (2026-10-27, argus101-program-20261027/wave4/bench-awardline.md) + delta re-bench of v0.1.1 (argus101-program-20261027/wave4/rebench-awardline.md: D1–D5 all CLOSED, condition C4 SATISFIED, builder suite 26/26 reproduced). PASS-CONDITIONAL (local/simulator) is not CERTIFIED — certified is false, and nothing beyond that verdict at its exact scope is claimed. Scope is exactly: local stdio, fixture award terms + fixture spend records only, value_class "test"; no real award, real grantee, real funds, real accounting system, or government system is touched. Load-bearing label: an Awardline report is a recomputation from sealed receipts, not an audit, not an allowability determination, and not agency acceptance. Standing conditions: C1 §10 counsel/govcon gate (unbuilt, binds any real-award reliance), C2 external anchor (caps the verdict at PASS-CONDITIONAL), C3 real Herald RS256 (required with re-bench before any live phase), C5 name screen still bind.

Publication integrity

Receipt hash: none published — no receipt is linked to this record in the current records

Anchor state: NOT_ANCHORED No receipt hash is linked to this record in the published records; verdict anchoring ships with Phase-1 D2 of the Eclipse Anchor program.

Full verification view — integrity result, digests, and evidence for this listing.

Operational status

Trust state: UNVERIFIED · Drift: UNKNOWN

Benched version: — · Latest seen: 0.1.1

Verify it yourself

  1. Cross-check the verdict and scope against this product's record in the append-only verdict feed (/verdicts.json) — corrections arrive only as superseding records.
  2. On-chain: not yet available for this verdict — no receipt is linked to it in the published records (per-verdict anchoring arrives with Phase-1 D2). The scorecard and the verdict feed are the complete published record until then.